ABB PPD113B01-10-150000 3BHE023784R1023 Product Introduction
Product Description
The ABB PPD113B01-10-150000 3BHE023784R1023 is a high-performance power distribution unit, engineered to manage and distribute electrical power efficiently in industrial automation systems. It is designed to handle high current loads, making it suitable for applications in heavy machinery, power generation facilities, and large-scale manufacturing plants. This unit ensures stable power supply to connected equipment, protecting against overloads and short circuits to minimize downtime. With its robust design and advanced safety features, it integrates seamlessly into complex power systems, providing reliable power distribution and enhancing overall operational safety.
Technical Parameters
- Rated Voltage: 400 V AC, compatible with standard industrial power grids.
- Rated Current: 150 A, capable of handling high-power industrial equipment.
- Number of Output Circuits: 10 channels, allowing flexible power distribution to multiple devices.
- Overload Protection: Built-in thermal overload protection, with a trip current of 180 A (120% of rated current).
- Short-Circuit Breaking Capacity: 50 kA at 400 V AC, ensuring safe operation during fault conditions.
- Operating Temperature Range: -5 ~ 55 °C, suitable for typical industrial environments.
- Storage Temperature Range: -25 ~ 70 °C, maintaining integrity during storage.
- Relative Humidity: 5% ~ 95% (non-condensing), resistant to moisture-related issues.
- Protection Degree: IP30, providing protection against solid objects larger than 2.5 mm.
- Dimensions (L × W × H): 450 mm × 250 mm × 180 mm, compact for installation in control cabinets.
- Weight: Approximately 8.5 kg, sturdy enough for industrial use.
- Mounting Type: Flange mounting, ensuring secure installation in various setups.
- Input Connection: Busbar connection (60 × 10 mm), facilitating high-current input.
The ABB PPD113B01-10-150000 3BHE023784R1023 is available for sale worldwide, with coverage across all major industrial regions. Orders are processed promptly, and delivery is guaranteed within 3 days, ensuring quick integration into your power distribution systems to minimize operational delays.
There are no reviews yet.